• Home
  • Tenders
  • Denmark
  • Agreement for the Supply of Spare Parts, Technical Support and Engineering Services

Agreement for the Supply of Spare Parts, Technical Support and Engineering Services

AI Summary

The procurement concerns an agreement to supply spare parts, technical support and engineering services for the passenger vehicles and automatic train control (ATC) systems used on Copenhagen Metro lines M1‑M4, including any future extensions of those lines. The deliverables will cover all existing infrastructure and the interfaces between the vehicles, ATC, and other elements of the metro system, thereby ensuring seamless operation and maintenance of the highly sophisticated transport network. The agreement supplements the separate operation and maintenance contract that will cover the bulk of routine maintenance, reserving the specialist intervention for cases that the operator cannot resolve and for higher‑level maintenance requirements.

Only the awarded supplier, possessing exclusive rights and the necessary technical knowledge and test facilities, can provide the required parts, repairs and engineering services. The support services will be delivered on‑site with tightly stipulated response times and remotely when appropriate, in accordance with the technical specifications and safety standards governing Copenhagen Metro operations. The deliverables must comply with the system design specifications and the European rail industry standards applicable to passenger vehicle and ATC components.

Description

Previously, Metroselskabet I/S (hereafter “Metroselskabet”) tendered out the transportation system contracts for the M1-M4 lines of the Copenhagen Metro. The contracts were awarded to Hitachi Rail STS S.p.A. (hereafter “the Supplier”). Under the contracts, the Supplier has provided a number of systems / assets. These systems / assets include, in particular, passenger vehicles and automatic train control (ATC) (and are hereafter collectively referred to as “the Systems”). The Systems are essential for the operation and functionality of the Copenhagen Metro and are generally characterized by a very high degree of technical complexity and by their reliance on specialized knowledge and insight into the Systems, their coherence, software, etc. on a deeper level. Due to technical reasons and exclusive rights, the Supplier is the only economic operator who is able to supply certain specific spare parts, repairs of spare parts, technical support (on-site and subject to strict response times) and engineering services (remote) related to certain subsystems of the Systems (hereafter “the Deliverables”). Metroselskabet therefore intends to conclude a new agreement with the Supplier covering supply of the Deliverables (hereafter “the Agreement”). The scope of the Agreement encompasses Deliverables for all existing lines (M1-M4), including future extensions to these lines to the extent that the Systems will also be used for such extensions. Further, the scope of the Agreement also includes Deliverables for interfaces from the passenger vehicles and the ATC to other elements of the transportation system. The Agreement shall supplement the contract regarding operation and maintenance of the Copenhagen Metro M1-M4 (hereafter “the O&M Contract”) which has been put out to tender by Metroselskabet, see Contract Notice No. 471641-2025 (and potentially also later O&M contracts). The O&M Contract will include the vast majority of services, parts, etc. required for the metro. As an example, the operator under the O&M Contract will be responsible for the greater part of the fault finding, corrective and preventive maintenance, etc., whereas the Supplier will only be engaged when an issue cannot be resolved by the operator / requires support on higher and more complex maintenance levels. The Agreement is expected to be concluded in the fall of 2025 after which a mobilization period shall commence. The actual commencement of the Agreement will, with certain exceptions, occur when the O&M Contract becomes effective (expected in September 2026). The duration of the Agreement shall be until the 29 September 2032. However, Metroselskabet may extend the Agreement for a total of up to 144 months (that is, until 29 September 2044, at the latest). Further, the Supplier shall be available for providing assistance for a period of up to 6 months after the expiry or termination of the Agreement in order to facilitate the transition to a future scenario where the Deliverables, in whole or in part, are no longer required (due to e.g. the end of life of the Systems).
Additional information: The contract value stated in this notice is the estimated value of the Agreement and therefore does not necessarily reflect the final value of the Agreement. Metroselskabet is not bound by this stated value.
Place of performance: DK012

Lot: LOT-0001
Title: Agreement for the Supply of Spare Parts, Technical Support and Engineering Services


Details

Status:
Awarded
Procedure type:
Negotiated Procedure
Sectors:
34630000 - Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
34631000 - Parts of locomotives or rolling stock
34632000 - Railways traffic-control equipment
+3 more
Place of origin:
Denmark
Places of performance:
Denmark
Denmark
Contract duration:
Start date: 2025-11-20+01:00, End date: 2045-03-29+02:00
Contract type:
Member-only information
Publication date:
Member-only information
Created date:
Member-only information
Update date:
Member-only information

Stored documents

Member-only information

Original URL:

Member-only information
Buyers
Member-only information

Awards

Member-only information