Corrigendum - Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems
Description
The scope of the procedure includes design services (for In-Divertor Electrical Services (IDES) components), pre-manufacturing services, hardware procurement, manufacturing activities, testing activities, cleaning, packaging and delivery. IDES provides electrical infrastructure for diagnostic sensors located in the divertor cassettes. Such infrastructure comprises of cabling, electrical junction boxes and connectors (including a connector that will be manipulated by remote means). Overall 16 sets need to be provided. In-Vessel supports concerns various types of mechanical supports for mineral insulated (MI) cabling to be used inside the vacuum vessel in the transmission lines of various diagnostic systems of the ITER machine. Please refer to Annex B.1 (IDES Technical Specification) and Annex B.2 (IVS Technical Specification) for additional details.
Additional information: See internet address provided in Section 8.1 ORG0001 of this contract notice. 1. Tenderers can only submit a tender via the foreseen eSubmission tool detailed in the procurement documents; 2. Tenderers are informed that the awarded contract will not be signed in paper. Signature of the contract will take place through a web-based tool called deviation, amendment and contract changes (DACC). The contract must be signed by the tenderer’s legal representative in DACC. Signature of the contract in DACC is considered as equivalent to a paper document with a handwritten signature and shall be admissible as evidence in legal proceedings. It is legally binding; 3. This notice and the rest of the procurement documents will be published also on the joint undertaking's buyer's profile. Economic operators are strongly advised to regularly visit the webpage in Section 8.1 ORG0001 of this notice. 4) This procurement procedure is governed by the rules laid down by: (a) Regulation (EU, Euratom) 2018/1046; referred to as the ‘General Financial Regulation’ (GFR); and (b) complemented, where it derogates, by the: Financial Regulation for Fusion for Energy adopted by Governing Board decision of 10 December 2019. All legislation can be found on: http://www.fusionforenergy.europa.eu/procurementsgrants/keyreference.aspx
Description of modifications: Impact on Schedule (Months): 21.53 | Impact on Technical scope: Yes | Impact on Cost (Euros): 1200000.00 | Annex S : New Microsoft Project Schedule shows new deliverable dates | Annex J: New Interim Payment Plan | Development of the new Mineral Insulated Cable supply chain including new detailed activities held by suppliers and new activities to be managed by GUTMAR | GUTMAR will manufacture complete MI Cables assembled including UHV terminations. The Supplier shall qualify a complete MI cable supply chain for the full scope of the ultra‐high vacuum terminated mineral insulated cables.| New deliverables added to the scope including drawings: "Prototype and testing qualification plan", "Testing results" and "VCD demonstrating compliance with all requirements related to MI Cabling"/ 7 new Deliverables with cost impact will be added to the Project scope: X1. Design and definition of the new supply chain for MI Cables (MIC); X2. Development (R&D+i) for cables and UHV terminations, Drawings, Material Purchase for Terminations, MI Cables Prototypes and test plans for MIC and terminations; X3. Technical & Quality Requirements to flow down to the MI Cables new supply chain; X4. Quality and monitoring activities regarding the 5 critical subcontractors of the new supply chain for MI Cables (MIC); X5. Remaining Prototypes MIC manufacturing; X6. Testing &Test reports for qualification of MI Cables; X7. Verification Control Documents (VCD) / 4 new Intermediate Deliverables without cost impact will be added to the Project scope: D1. Intermediate Deliverable 1. All MI cables manufactured without terminations; D2. Intermediate Deliverable 2. All MI Terminations manufactured; D3. Intermediate Deliverable 3 Approval of ‐ MI cables ‐ First of Series; D4. Intermediate Deliverable 4 Approval of ‐ MI cables ‐ Batch 1.1 | Text clarification in section "2.2. Scope of supply": -“Manufacture, assemble (of all element and joints under scope of this contract, including joining of cabling, connectors, pins, sockets, etc), test, cleaning, packaging and deliver the IDES components and sub‐systems to ITER and Divertor Cassette Integrator” | New deliverables and its associated cost are related only to the new qualification activities that need to be carried out by GUTMAR to replace the former MI cable Supplier (Thermocoax). RES-0001
Place of performance: Supplier premises.
Additional information: See internet address provided in Section 8.1 ORG0001 of this contract notice. 1. Tenderers can only submit a tender via the foreseen eSubmission tool detailed in the procurement documents; 2. Tenderers are informed that the awarded contract will not be signed in paper. Signature of the contract will take place through a web-based tool called deviation, amendment and contract changes (DACC). The contract must be signed by the tenderer’s legal representative in DACC. Signature of the contract in DACC is considered as equivalent to a paper document with a handwritten signature and shall be admissible as evidence in legal proceedings. It is legally binding; 3. This notice and the rest of the procurement documents will be published also on the joint undertaking's buyer's profile. Economic operators are strongly advised to regularly visit the webpage in Section 8.1 ORG0001 of this notice. 4) This procurement procedure is governed by the rules laid down by: (a) Regulation (EU, Euratom) 2018/1046; referred to as the ‘General Financial Regulation’ (GFR); and (b) complemented, where it derogates, by the: Financial Regulation for Fusion for Energy adopted by Governing Board decision of 10 December 2019. All legislation can be found on: http://www.fusionforenergy.europa.eu/procurementsgrants/keyreference.aspx
Description of modifications: Impact on Schedule (Months): 21.53 | Impact on Technical scope: Yes | Impact on Cost (Euros): 1200000.00 | Annex S : New Microsoft Project Schedule shows new deliverable dates | Annex J: New Interim Payment Plan | Development of the new Mineral Insulated Cable supply chain including new detailed activities held by suppliers and new activities to be managed by GUTMAR | GUTMAR will manufacture complete MI Cables assembled including UHV terminations. The Supplier shall qualify a complete MI cable supply chain for the full scope of the ultra‐high vacuum terminated mineral insulated cables.| New deliverables added to the scope including drawings: "Prototype and testing qualification plan", "Testing results" and "VCD demonstrating compliance with all requirements related to MI Cabling"/ 7 new Deliverables with cost impact will be added to the Project scope: X1. Design and definition of the new supply chain for MI Cables (MIC); X2. Development (R&D+i) for cables and UHV terminations, Drawings, Material Purchase for Terminations, MI Cables Prototypes and test plans for MIC and terminations; X3. Technical & Quality Requirements to flow down to the MI Cables new supply chain; X4. Quality and monitoring activities regarding the 5 critical subcontractors of the new supply chain for MI Cables (MIC); X5. Remaining Prototypes MIC manufacturing; X6. Testing &Test reports for qualification of MI Cables; X7. Verification Control Documents (VCD) / 4 new Intermediate Deliverables without cost impact will be added to the Project scope: D1. Intermediate Deliverable 1. All MI cables manufactured without terminations; D2. Intermediate Deliverable 2. All MI Terminations manufactured; D3. Intermediate Deliverable 3 Approval of ‐ MI cables ‐ First of Series; D4. Intermediate Deliverable 4 Approval of ‐ MI cables ‐ Batch 1.1 | Text clarification in section "2.2. Scope of supply": -“Manufacture, assemble (of all element and joints under scope of this contract, including joining of cabling, connectors, pins, sockets, etc), test, cleaning, packaging and deliver the IDES components and sub‐systems to ITER and Divertor Cassette Integrator” | New deliverables and its associated cost are related only to the new qualification activities that need to be carried out by GUTMAR to replace the former MI cable Supplier (Thermocoax). RES-0001
Place of performance: Supplier premises.
Lot: LOT-0001
Title: Final Design and Supply of In-Divertor Electrical Services (IDES) and Supply of In-Vessel Supports (IVS) for Mineral Insulated (MI) Cabling for ITER Diagnostics Systems
Details
Status:
Awarded
Sectors:
31600000 - Electrical equipment and apparatus
31200000 - Electricity distribution and control apparatus
Place of origin:
Spain
Places of performance:
Spain
Contract duration:
57 MONTH
Contract type:
Goods
Publication date:
Feb 24, 2026
Created date:
Feb 26, 2026
Update date:
Oct 3, 2026