QatarEnergy seeks an Engineering, Procurement, and Construction (EPC) contractor for the upgrade of a potable water network connecting Dukhan Joint Facilities Terminal (JFT) to the Field Network Distribution System (FNDS). The project encompasses the design, construction, and commissioning of a new potable water network system.

This system will include replacing existing 8" and 4" potable water pipelines with new integrated pipelines of suitable sizes, ranging from 2" to 6". The scope also involves constructing a new demineralized (DM) water plant with a design capacity of 2 m3/hr to meet DM water demand. Additionally, the project requires building a new 200 m3 concrete tank at DSFA to enhance potable water storage capacity and connecting three existing irrigation water tanks to the new potable water distribution header.

Following successful commissioning of the new facility, the scope includes the demolition of existing pipelines (8" and 4" headers & branch lines). The new DM water plant will feature a local control panel, feed pumps, storage tank, tanker filling pumps, and a tanker filling station. A disinfectant injection facility will be provided if required to meet potable water quality standards.

Description

Bond: 800000
Fee: 500
Scope of Work/Description:
Brief Summary of Scope of Services. The objective of the EPIC related SERVICES for implementation of the proposed facility/ facilities (construction and demolition scope) to ensure uninterrupted water supply to DCA consumers. Brief scope as listed below. a. Replacement of Existing Potable Water Pipelines (8", 4" and branch lines) ",,Replace existing 8" (from DDP to FNDS) and 4" (from DDP to Beach house) pipelines with new integrated pipeline of suitable size supplying potable water to all existing consumers connected with 8" and 4" pipelines. The New pipeline shall be routed from DDP to FNDS via DWS, Beach house and DSFA. ",,Disinfectant Injection facility will be provided (if required) to meet potable water quality standards. ",,The new/replacement branch lines (sizes from 2" to 6") shall be connected to the relevant consumers. b. New DM (Demineralized) Water Plant ",,DM water plant (including local control panel) having design capacity of 2 m3/hr (to be re-confirmed during FEED) is required to meet the DM water demand of DCA consumers. Along with DM water package, DM water package feed pumps, DM water storage tank, DM water tanker filling pumps and tanker filling station are also required. c. New Concrete Tank at DSFA ",,A new concrete tank having 200 m3 storage capacity is required at DSFA for enhancement of potable water central storage capacity from 150 m3 (existing concrete tank) to 350 m3 for ensuring two days storage capacity considering average potable water consumption of approximately 175 m3/day. Upgrade of potable water storage system is required at DSFA (including possible upgrade of pumping facility) to address any unforeseen scenario (pipeline leakage and maintenance, which may take up to 2 days) and ensure interrupted supply to potable water users at DSFA. d. New line to existing irrigation water tanks (3 numbers) from the new pipeline ",,Three number of existing irrigation water tanks (IRT-SFA-76, IRT-R11-77 & IRT-R11-78) to be connected to the new potable water distribution header along with required instrumentation for flow control, level control/tank filling shall be required for this purpose. e. Demolition (8", 4" and branch lines) ",,Demolition of existing pipelines (8" and 4" headers & branch lines) is required after successful commissioning of new facility. Demolition of following existing potable water pipelines (including demolition of pipelines, supports, associated civil works, earthworks, and all existing related facilities) shall be performed under this project.

Tender Issue Period: 06/07/25 - 17/07/25
Bond Validity: 28/01/26- (150) days from the Bid Closing Date
OfferValidity: 29/12/25- (120) days from the Bid Closing Date
Note: a) Tender documents for the above services/works/goods can be obtained from the Dates of Issue within the Tender Sale Period. Tender Issue Time ends at 2 PM (local time) of the Sale period's end date.

b) Suppliers and Contractors who are already registered with QatarEnergy via e-Registration system and are in possession of a valid SAP ID issued by QatarEnergy can buy the Tender document online using the Buy Tender Online link within the Tender Issue Period indicated above.

c) Requests for issuance of Tenders after the specified Tender Issue Period will not be entertained. QatarEnergy reserves its right, in its own discretion, to set and recall Tender Issue Periods.

d) No queries will be entertained, or bids received, from entities who have not purchased tender documents in compliance with the above provisions.

e) All prospective Contractors/suppliers interested to participate in QatarEnergy Tenders are required to register and obtain a QatarEnergy SAP Vendor Code, a mandatory requirement for the issue of Tender Document.

f) All bidders shall ensure that the business/company name, contact persons and other details in all relevant documents to reflect the details as stated in the commercial registration documents.

g) Bidders/Contractors, who are registered with QatarEnergy and possess a QatarEnergy SAP Vendor ID, shall with immediate effect ensure that any change to the vendor details is updated with QatarEnergy via e-Registration to ensure smooth processing of Tender, Contract and Payment related matters without any delay.

h) For more information, please visit our Vendor Registration page.

Details

Status:
Closed
Procedure type:
Open Procedure
Tender type:
Invitation to Tender (ITT)
Sectors:
45000000 - Construction work
Place of origin:
Qatar
Places of performance:
Qatar
Deadline:
Aug 31, 2025, 08:59 PM
Publication date:
Member-only information
Created date:
Member-only information
Update date:
Member-only information

Original URL:

Member-only information
Buyers
Member-only information