- Home
- Tenders
- Philippines
- Supply and Delivery of Tools and Equipment/Start up Kit under Ecological SRI
Supply and Delivery of Tools and Equipment/Start up Kit under Ecological SRI
AI Summary
The Department of Agriculture – Region I is inviting qualified suppliers to provide a comprehensive start‑up kit for ecological Small Rural Industries. The kit encompasses a variety of agricultural tools and storage containers, including heavy‑duty stainless steel weighing scales with a 60‑kg capacity, green‑infrastructure verified GI sheet water sprinklers of 10 L capacity, all‑steel pointed shovels, multi‑purpose steel sickles, large blue plastic drums of 200 L and 100 L capacities, food‑grade plastic bucket pails with covers, stainless steel strainers, rubberised trapal sheets, and a large quantity of transparent polyethylene bags. In total, 4,777 pieces are required, covering 3 weighing scales, 9 sprinklers, 16 shovels, 90 sickles, 60 200‑L drums, 30 100‑L drums, 30 bucket pails, 9 strainers, 30 trapal sheets, and 4,500 bags.
The goods must be delivered to the specified sites in Sta Rita West, Aringay and San Jose Sur, Agoo, La Union, within 20 working days after receipt of the purchase order. All prospective suppliers must submit mandatory documents, including a valid mayor’s or business permit, PhilGEPS registration number, notarized omnibus sworn statement, and a current income/business tax return. Compliance with the technical specifications listed for each item is mandatory, and failure to meet any requirement will render the quotation ineligible. All items must meet the described technical specifications and be delivered within twenty working days after purchase order.
Description
|
Weighing scale, heavy duty, stainless plate, 60 kgs capacity- 3 pcs |
|
Water sprinkler, GI sheet, 10L capacity- 9 pcs |
|
Shovel, heavy duty, pointed, all steel- 16 pcs |
|
Multi-purpose Sickle, steel (tabas)- 90 pcs |
|
Plastic drum, 200L capacity, blue- 60 pcs |
|
Plastic drum, 100L capacity, blue- 30 pcs |
|
Plastic bucket pail with cover, food grade, 20L capacity, white- 30 pcs |
|
Strainer, stainless steel, double handle, 24cmx11.5cm- 9 pcs |
|
Trapal, 8ft x 10ft, rubberized - 30 pcs |
|
Polyethylene plastic bag, transparent, 24"x36", .0018 thickness- 4,500 pcs |
|
Delivery period/schedule: within 20 working days upon receipt of PO |
|
Drop off Point: Sta Rita West, Aringay and San Jose Sur, Agoo, La Union |
INSTRUCTIONS: | |||||||||||||||||||||||||||||||||||
|
Note: Failure to follow these instructions will disqualify your entire quotation. | |||||||||||||||||||||||||||||||||||
|
(1) Do not alter the contents of this form in any way. | |||||||||||||||||||||||||||||||||||
|
(2) The use of this RFQ is highly encouraged to minimize errors or omissions of the required mandatory provisions. In case of any changes, bidders must use or refer to the latest version of the RFQ, except when the latest version of the RFQ only pertains to deadline extension. | |||||||||||||||||||||||||||||||||||
|
If another form is used other than the latest RFQ, the quotation shall contain all the mandatory requirements/provisions including manifestation on the agreement with the Terms and Conditions below. | |||||||||||||||||||||||||||||||||||
|
In case a prospective supplier/service provider submits a filled-out RFQ with a supporting document (i.e., a price quotation in a different format), both documents shall be considered unless there will be discrepancies. In this case, provisions in the RFQ shall prevail. | |||||||||||||||||||||||||||||||||||
|
(3) All technical specifications must be complied with. Failure to comply with the mandatory requirements shall render the quotation ineligible/disqualified. | |||||||||||||||||||||||||||||||||||
|
(4) Quotations may be submitted through electronic mail at bacsec@ilocos.da.gov.ph | |||||||||||||||||||||||||||||||||||
|
(5) Quotations, including documentary requirements, received after the deadline shall not be accepted. For quotations submitted via electronic mail, the date and time of receipt indicated in the e-mail shall be considered. | |||||||||||||||||||||||||||||||||||
|
TERMS AND CONDITIONS: | |||||||||||||||||||||||||||||||||||
|
1. Bidders shall provide correct and accurate information required in this form. | |||||||||||||||||||||||||||||||||||
|
2.Any interlineations, erasures, or overwriting shall be valid only if they are signed or initialed by you or any of your duly authorized representative/s. | |||||||||||||||||||||||||||||||||||
|
3.Price quotation/s must be valid for a period of ONE HUNDRED TWENTY (120) calendar days from the deadline of submission. | |||||||||||||||||||||||||||||||||||
|
4.Price quotation/s, to be denominated in Philippine peso, shall include all taxes, duties, and/or levies payable. | |||||||||||||||||||||||||||||||||||
|
5.Quotations exceeding the Approved Budget for the Contract shall be rejected. | |||||||||||||||||||||||||||||||||||
|
6.In case of two or more bidders are determined to have submitted the Lowest Calculated Quotation/Lowest Calculated and Responsive Quotation, the DA-RF01 shall adopt and employ “draw lots” as the tie-breaking method to finally determine the single winning provider in accordance with GPPB Circular 06-2005. | |||||||||||||||||||||||||||||||||||
|
7.Award of contract shall be made to the lowest quotation which complies with the technical specifications, requirements and other terms and conditions stated herein. | |||||||||||||||||||||||||||||||||||
|
8.The item/s shall be delivered according to the accepted offer of the bidder. | |||||||||||||||||||||||||||||||||||
|
9.Item/s delivered shall be inspected on the scheduled date and time of the DA-RFO1. The delivery of the item/s shall be acknowledged upon the delivery to confirm the compliance with the technical specifications. | |||||||||||||||||||||||||||||||||||
|
10.Payment shall be made after delivery and upon the submission of the required supporting documents, i.e., Order Slip and/or Billing statement, by the supplier, contractor, or consultant. Our Government Servicing Bank, i.e., the Land Bank of the Philippines, shall credit the amount due to the identified bank account of the supplier, contractor, or consultant not earlier than twenty-four (24) hours, but not later than forty-eight (48) hours, upon receipt of our advice. Please note that the corresponding bank transfer fee, if any, shall be chargeable to the account of the supplier, contractor, or consultant. | |||||||||||||||||||||||||||||||||||
|
11.Liquidated damages equivalent to one-tenth of one percent (0.1%) of the value of the goods not delivered within the prescribed delivery period shall be imposed per day of delay. The DA-RF01 may terminate the contract once the cumulative amount of liquidated damages reaches ten percent (10%) of the amount of the contract, without prejudice to other courses of action and remedies open to it | |||||||||||||||||||||||||||||||||||
|
12.The Procuring Entity may cancel or terminate the contract at any time in accordance with the grounds provided under RA No. 12009 and its revised IRR. | |||||||||||||||||||||||||||||||||||
|
13.The RFQ, Purchase Order (PO), and other related documents for the above-stated Procurement projects shall be deemed to form part of the contract. | |||||||||||||||||||||||||||||||||||
Notice Reference Number: 83886
Status: Closed
Lot Type: Single Lot
Procurement Mode: Small Value Procurement
Classification: Goods
Applicable Procurement Rules: Implementing Rules and Regulations
Funding Source: Regular Agency Fund (01000000)
Delivery/Project Location: La Union
Business Category: Containers and storage
Line Item Details:
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 24112109 | Non metallic drums | Supply and Delivery of Tools and Equipment/Start-up Kit under Ecological SRI | 4777 | Piece |