AI Summary

The Joint Research Centre of the European Commission is procuring a complete Proton‑Exchange‑Membrane electrolysis system for on‑site green hydrogen production at its Ispra facility. The tender requires a design, manufacture, delivery, installation and commissioning of a 50 Nm³ h electrolyser, with a provision for future upgrade to 100 Nm³ h, capable of delivering hydrogen at an outlet pressure of 30 bar. The core plant will be supplied as a containerised/skid unit divided into a control‑panel section containing an AC/DC converter, a water‑purification module, and an ATEX‑classified area housing the PEM stacks and gas‑purification system. Ancillary equipment will also be provided, including an MV/LV transformer, a dry‑cooler for thermal management, a low‑pressure hydrogen storage system comprising a 5 m³ cylinder rack at 30 bar, and a gas blender to be installed on the outlet line following storage.

The procurement further encompasses a full service package covering factory and site acceptance testing, ATEX verification, staff training, a two‑year supply of spare parts, and a three‑year maintenance contract. The hydrogen produced will be blended up to 10 % volume into the local natural‑gas pipeline to feed the JRC’s cogenerators, utilizing excess electricity from an existing 1.35 MW photovoltaic installation that is planned to be expanded to 2 MW and subsequently 3 MW. Technical sizing studies have identified a modular 2 × 250 kW electrolyser configuration as the most efficient balance between available photovoltaic power, plant operating hours, and cogeneration demand across present and future expansion scenarios.

The system must comply with ATEX requirements, be upgradable to 100 Nm³ h, and achieve an outlet pressure of 30 bar.

Description

The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEXclassified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: An MV/LV transformer A thermal management system (dry cooler) A lowpressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for selfconsumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's cogenerators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from the cogenerators across current and future PV expansion scenarios
Additional information: In case of unavailability or disruptions in the functioning of the electronic means of communication provided in Section 5.1.11 in the last 5 calendar days before the time limit for receipt indicated in Section 5.1.12, the contracting authority reserves the right to extend this time limit and publish the extension at the Internet address provided in Section 5.1.11, without a preceding publication of a corrigendum to this notice. Economic operators interested in this procurement are invited to subscribe to the call for tenders at the address in Section 5.1.11 in order to get notified when new information or documents are published.
Place of performance: Please consult the procurement documents.

Lot: LOT-0001
Title: Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra


Details

Status:
Closed
Procedure type:
Open Procedure
Sectors:
42980000 - Gas generators
45259000 - Repair and maintenance of plant
45310000 - Electrical installation work
+7 more
Place of origin:
Italy
Places of performance:
Italy
Deadline:
Oct 8, 2026, 02:00 PM
Contract duration:
74 MONTH
Contract type:
Member-only information
Publication date:
Member-only information
Created date:
Member-only information
Update date:
Member-only information

Stored documents

Member-only information

Documents access instructions

Member-only information

Original URL:

Member-only information
Buyers
Member-only information