UPPER CHICO RIS (CAWAGAYAN AND IPIL AREA)
AI Summary
The National Irrigation Administration – Kalinga Irrigation Management Office seeks to construct a solar‑powered pump irrigation system for the Upper Chico Ris area in Caungayan and Ipil. The procurement covers a comprehensive package that includes drilling and casing of a 70‑meter well, installation of well development, gravel packing, and delivery of 8‑inch uPVC piping and FITINGS. It also encompasses the supply and installation of a 10‑horsepower submersible pump, electronic flow meter, 4‑inch hydraulic control valve, and associated piping for both a groundwater and a surface irrigation unit. A full set of solar panels—32 two‑panel, 700‑watt bifacial HJT modules, MC4 connectors, DC and AC cabling, and grounding—is specified as well as an AI‑satellite assisted monitoring system, inverter, and control panel to support remote monitoring and data capture.
Additional construction works include the erection of worker sheds, a project billboard, safety fencing, stalling pool, and shoreline perimeter for environmental protection. Hot‑dip galvanized metallic fences, razor wire, and concertina wire are to be fabricated and installed as a security fence. The scope also incorporates a full electrical system comprising AC and DC mains, cables, protective conduits, and the mounting structure for the solar array. The contract further covers general site preparation such as excavation, backfill, concrete footing, rebar, plastering, painting, waterproofing, and the supply and installation of a 45‑meter hot‑dip galvanized chain‑link fence, 8‑meter solar street lights, and gate components. All materials and installations must meet Philippine standards for civil and electrical works, with equipment rated for 24‑48 hour pumping tests to determine final pump specifications. The project is delivered under competitive public bidding as a single lot with a regular agency funding source.
Description
|
DESCRIPTION |
QUANTITY |
UNIT |
|
CONSTRUCTION OF SOLAR POWERED PUMP IRRIGATION SYSTEM |
|
|
|
Mobilization and Demobilization & Temporary Facilities |
|
|
|
Mobilization and Demobilization |
1.00 |
lot |
|
Construction of Worker Shed/Bodega with Portable Toilet |
2.00 |
lot |
|
Project Billboard |
1.00 |
lot |
|
CONSTRUCTION HEALTH AND SAFETY |
1.00 |
Ls. |
|
CONSTRUCTION OF ONE(1) UNIT SOLAR POWERED PUMP IRRIGATION SYSTEM-GROUND WATER SOURCE |
|
|
|
GEO RESISTIVITY |
1.00 |
lot |
|
WELL DRILLING |
70.00 |
li.m |
|
WELL CASING & DEVELOPMENT |
|
|
|
Well Development |
1.00 |
unit |
|
Gravel Pack/Gravel Filter |
2.90 |
cu.m |
|
Supply and Delivery of 8" ⌀ uPVC Pipe x 6m |
68.00 |
li.m |
|
Installation of 8" ⌀ uPVC Pipe x 6m |
68.00 |
li.m |
|
PUMP TEST(24-48HRS) (Specification of pump to be procured is based on the result of pumping test) |
1.00 |
unit |
|
SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMP, PIPING & ACCESSORIES |
|
|
|
Supply and Delivery |
|
|
|
a. Submersible Pump (10hp) |
1.00 |
lot |
|
b. Electronic Flow Meter |
1.00 |
assy |
|
c. 4" Hydraulic Control Valve |
1.00 |
assy |
|
d.62 li.m - 3"PipeandFittings |
1.00 |
unit |
|
Installation of Submersible Pump,Flow Meter, Hydraulic Control Valve and Pipes with Fittings |
1.00 |
unit |
|
SOLAR PANEL |
|
|
|
Supply and Delivery |
|
|
|
a. PV Modules (Solar Panel 700watts)-(bifacial)-with HJT Technology |
32.00 |
pc |
|
b. MC4 Connector |
64.00 |
pair |
|
c. DC Cable from PV String (1x4mm²) |
61.75 |
ln.m |
|
d. AC Cable (8.0 mm²) |
61.75 |
ln.m |
|
e. 2" ⌀ RSC Conduit |
61.75 |
ln.m |
|
f. Grounding |
1.00 |
lot |
|
Installation of PV Modules, Conduits, Cables and Accessories |
1.00 |
lot |
|
AI SATELLITE ASSISTED MONITORING SYSTEM & INVERTER & CONTROL PANEL WITH AI SATELLITE ASSISTED MONITORING SYSTEM |
|
|
|
Supply & Delivery of AI SATELLITE ASSISTED MONITORING |
1.00 |
lot |
|
Supply & Delivery of Inverter and Controller |
1.00 |
lot |
|
Installation |
1.00 |
lot |
|
MOUNTING STRUCTURE (HOT DIP GALVANIZED) |
|
|
|
Supply ,Delivery and Fabrication |
1.00 |
lot |
|
Installation |
1.00 |
lot |
|
Structure Excavation(Manual) |
1.73 |
cu.m |
|
211 kg./sq.cm Concrete (Class "A") |
2.59 |
cu.m |
|
Gravel Blanket |
0.22 |
cu.m |
|
Reinforcing Steel Bar |
161.99 |
kgs. |
|
Painting Works |
3.96 |
sq.m |
|
CONSTRUCTION OF PERIMETER FENCE,STILLING POOL AND NIA LOGO AND BAGONG PILIPINAS LOGO |
|
|
|
Structure Excavation(Manual) |
3.86 |
cu.m |
|
Structure Backfill (Manual) |
1.99 |
cu.m |
|
211 kg./sq.cm Concrete (Class "A") |
5.09 |
cu.m |
|
Reinforcing Steel Bar |
279.65 |
kgs. |
|
4" thk. CHB (Laying & Plastering of Both Sides) |
8.40 |
sq.m |
|
Supply, Delivery, and Installation of 45 Linear Meters of 3.4 mm Thick Hot-Dip Galvanized Cyclone Chain-Link Fence (50 mm × 50 mm Mesh Opening), complete with 424.116 Linear Meters of 2.5 mm Thick Hot-Dip Galvanized Concertina Razor Wire (300 mm Diameter Coil) installed on top as a Security Fence. |
1.00 |
lot |
|
2" Ø G.I Pipe( sch. 40) |
160.00 |
li.m |
|
Painting Works |
19.56 |
sq.m |
|
Water Proofing |
12.00 |
sq.m |
|
Gravel Blanket |
22.95 |
cu.m |
|
Red Oxide Metal Primer |
0.17 |
sq.m |
|
300 Watts Heavy Duty Solar Street Light |
8.00 |
pcs |
|
Drain Pipes- 4" GI Pipe and Accessories for Stilling Pool |
1.00 |
lot |
|
Fabrication and Installation of Project Details(Letterings) and Brushed Aluminum Logo |
1.00 |
lot |
|
Fabrication and Installation of Main Gate |
1.00 |
lot |
|
DISTRIBUTION PIPES |
|
|
|
Supply and Delivery of 3" HDPE Pipe SDR 17(PE 100) |
360.00 |
li.m |
|
Installation of 3" HDPE Pipe SDR 17(PE 100) |
360.00 |
li.m |
|
CONSTRUCTION OF ONE(1) UNIT SOLAR POWERED PUMP IRRIGATION SYSTEM-SURFACE |
|
|
|
SUPPLY, DELIVERY AND INSTALLATION OF SUBMERSIBLE PUMP, PIPING & ACCESSORIES |
|
|
|
Supply and Delivery |
|
|
|
a. Submersible Pump (10hp) |
1.00 |
lot |
|
b. Electronic Flow Meter |
1.00 |
assy |
|
c. 4" Hydraulic Control Valve |
1.00 |
assy |
|
d. 3" Pipe and Fittings |
1.00 |
unit |
|
Installation of Submersible Pump,Flow Meter, Hydraulic Control Valve and Pipes with Fittings |
1.00 |
unit |
|
SOLAR PANEL |
|
|
|
Supply and Delivery |
|
|
|
a. PV Modules (Solar Panel 700watts)-(bifacial)-with HJT Technology |
32.00 |
pc |
|
b. MC4 Connector |
64.00 |
pair |
|
c. DC Cable from PV String (1x4mm²) |
61.75 |
ln.m |
|
d. AC Cable (8.0 mm²) |
61.75 |
ln.m |
|
e. 2" ⌀ RSC Conduit |
61.75 |
ln.m |
|
f. Grounding |
1.00 |
lot |
|
Installation of PV Modules, Conduits, Cables and Accessories |
1.00 |
lot |
|
AI SATELLITE ASSISTED MONITORING SYSTEM & INVERTER & CONTROL PANEL WITH AI SATELLITE ASSISTED MONITORING SYSTEM |
|
|
|
Supply & Delivery of AI SATELLITE ASSISTED MONITORING |
1.00 |
lot |
|
Supply & Delivery of Inverter and Controller |
1.00 |
lot |
|
Installation |
1.00 |
lot |
|
MOUNTING STRUCTURE (HOT DIP GALVANIZED) |
|
|
|
Supply ,Delivery and Fabrication |
1.00 |
lot |
|
Installation |
1.00 |
lot |
|
Structure Excavation(Manual) |
1.73 |
cu.m |
|
211 kg./sq.cm Concrete (Class "A") |
2.59 |
cu.m |
|
Gravel Blanket |
0.22 |
cu.m |
|
Reinforcing Steel Bar |
161.99 |
kgs. |
|
Painting Works |
3.96 |
sq.m |
|
CONSTRUCTION OF PERIMETER FENCE,STILLING POOL AND NIA LOGO AND BAGONG PILIPINAS LOGO |
|
|
|
Structure Excavation(Manual) |
3.86 |
cu.m |
|
Structure Backfill (Manual) |
1.99 |
cu.m |
|
211 kg./sq.cm Concrete (Class "A") |
5.09 |
cu.m |
|
Reinforcing Steel Bar |
279.65 |
kgs. |
|
4" thk. CHB (Laying & Plastering of Both Sides) |
8.40 |
sq.m |
|
Supply, Delivery, and Installation of 45 Linear Meters of 3.4 mm Thick Hot-Dip Galvanized Cyclone Chain-Link Fence (50 mm × 50 mm Mesh Opening), complete with 424.116 Linear Meters of 2.5 mm Thick Hot-Dip Galvanized Concertina Razor Wire (300 mm Diameter Coil) installed on top as a Security Fence. |
1.00 |
lot |
|
2" Ø G.I Pipe( sch. 40) |
160.00 |
li.m |
|
Painting Works |
19.56 |
sq.m |
|
Water Proofing |
12.00 |
sq.m |
|
Gravel Blanket |
22.95 |
cu.m |
|
Red Oxide Metal Primer |
0.17 |
sq.m |
|
300 Watts Heavy Duty Solar Street Light |
8.00 |
pcs |
|
Drain Pipes- 4" GI Pipe and Accessories for Stilling Pool |
1.00 |
lot |
|
Fabrication and Installation of Project Details(Letterings) and Brushed Aluminum Logo |
1.00 |
lot |
|
Fabrication and Installation of Main Gate |
1.00 |
lot |
|
INTAKE WORKS |
|
|
|
Concrete Demolition |
0.37 |
cu.m |
|
Common Sructure Excavation (Mechanized) |
249.74 |
cu.m |
|
Gravel Blanket |
0.36 |
cu.m |
|
Supply and Delivery of 12" HDPE Pipes SDR 17 |
60.00 |
li.m |
|
Installation of 12" HDPE Pipes SDR 17 |
60.00 |
li.m |
|
Reinforcing Bars |
1,032.63 |
kgs. |
|
211kg/sq.cm Reinforced Concrete |
8.66 |
cu.m |
|
Masonry Works |
20.08 |
sq.m |
|
Manual Backfill |
293.93 |
cu.m |
|
Fabrication , Delivery and Installation of Structure Accessories (Pump House) |
1.00 |
lot |
|
Procurement and Installation of 12" ∅ Gate Valve (Butterfly Valve Gear Operated-Double Flange with 2-12" ∅ Flange) |
1.00 |
lot |
|
DISTRIBUTION PIPES |
|
|
|
Common Excavation |
108.00 |
cu.m |
|
Supply and Delivery of 4" Ø HDPE Pipes SDR 17 |
360.00 |
li.m |
|
Installation of 4" Ø HDPE Pipes SDR 17 |
360.00 |
li.m |
|
Backfill |
64.80 |
cu.m |
|
Supply and Delivery of 3" HDPE Pipe SDR 17(PE 100) |
360.00 |
li.m |
|
Installation of 3" HDPE Pipe SDR 17(PE 100) |
360.00 |
li.m |
Notice Reference Number: 83843
Status: Published
Lot Type: Single Lot
Procurement Mode: Competitive Bidding (Public Bidding)
Classification: Civil Works - Infra Project
Applicable Procurement Rules: Implementing Rules and Regulations
Funding Source: Regular Agency Fund (01000000)
Delivery/Project Location: Kalinga
Business Category: Well drilling and construction services
Prebid Conference Date: 01-Oct-2026 01:30 PM
Prebid Conference Venue: NIA-KIMO Farmers Training Center, NIA-KIMO Compound, Purok 6, Bulanao,Tabuk City, Kalinga
Line Item Details:
| Item No. | UNSPSC | Lot Name | Lot Description | Quantity | Unit of Measure |
|---|---|---|---|---|---|
| 1 | 71120000 | Well drilling and construction services | Well drilling and construction services | 1 | Package |